Projects Multiphase / Wet
| Project Name | Description | More... |
|---|---|---|
Angola – PCC Recommendation |
Measurement and allocation for an operator's extensive holdings in deepwater Angola is ... |
|
DeepStar 8302 |
This work was approved by Deep Star in 2005 based on the results of internal member... |
|
Diana Measurement Analysis |
The Letton Hall Group was asked to analyze the risk faced a non-operating partner with a ... |
|
Gas Plant Analysis |
The work on this gas plant was aimed at discovering the source of a large measurement (mass)... |
|
Gendalo |
This will be the first deepwater production in Indonesia. The Letton Hall Group was asked to... |
|
GoM Measurement and Allocation Strategy |
This internal project preceded both Deep Star and RPSEA work, and tried to identify those ... |
|
Marco Polo Tieback |
The Letton Hall Group was asked to review the metering and allocation practices used... |
|
Marlin and Nakika Measurement and Allocation Assessment |
As the pre-eminent producer in the Gulf of Mexico, BP undertook an assessment of the quality ... |
|
Multiphase Measurement Training |
The Letton Hall Group was asked to conduct training in modern methods of upstream... |
|
Nakika Allocation Critique |
The Nakika hub integrates production from six producing fields – Coulomb, Herschel, ... |
|
Nikaitchuq Flow Measurement Manual |
The State of Alaska required an operator to provide an operating manual covering all flow ... |
|
Nikaitchuq LACT Station Commissioning |
An operator asked The Letton Hall Group to commission their LACT station, which ... |
|
Nikaitchuq LACT Station Modification |
Following the commissioning, The Letton Hall Group was asked to make recommendations... |
|
Oooguruk Measurement Technical Review |
The Letton Hall Group was asked to devise a measurement technical review program... |
|
Perdido |
The Letton Hall Group was asked to recommend how the production from this collection of ... |
|
PRCI Road Map |
The Pipeline Research Council, Inc. asked The Letton Hall Group to create a "road map"... |
|
Production Allocation Using Wet Gas/Multiphase Metering |
An operator had a requirement to define and implement an approved method of allocation... |
|
Production Allocation Using Wet Gas/Multiphase Metering (Pluspetrol Peru) |
An operator asked The Letton Hall Group to investigate allegations made by a pipeline... |
|
Red Eye Development Oversight |
Measurement experts in one operator were interested to see if the Weatherford ... |
|
Shenzi Measurement Analysis |
Bringing this large new field online required a well-reasoned measurement plan, which the... |
