Projects Liquid
| Project Name | Description | More... |
|---|---|---|
Angola – PCC Recommendation |
Measurement and allocation for an operator's extensive holdings in deepwater Angola is ... |
|
Canyon Express |
When this project went online in the Gulf of Mexico in September 2002, production from each of the ... |
|
Chemical Injection Metering Valves Recommendation |
The Letton Hall Group was asked to look at the state of the art and practice of deepwater ... |
|
DeepStar 8302 |
This work was approved by Deep Star in 2005 based on the results of internal member... |
|
GoM Measurement and Allocation Strategy |
This internal project preceded both Deep Star and RPSEA work, and tried to identify those ... |
|
Main Pass 139 Measurement Analysis |
The Letton Hall Group was asked to look at measurement data to determine if the ... |
|
Marco Polo Tieback |
The Letton Hall Group was asked to review the metering and allocation practices used... |
|
Marlin and Nakika Measurement and Allocation Assessment |
As the pre-eminent producer in the Gulf of Mexico, BP undertook an assessment of the quality ... |
|
Multiphase Measurement Training |
The Letton Hall Group was asked to conduct training in modern methods of upstream... |
|
Nakika Allocation Critique |
The Nakika hub integrates production from six producing fields – Coulomb, Herschel, ... |
|
Nikaitchuq Flow Measurement Manual |
The State of Alaska required an operator to provide an operating manual covering all flow ... |
|
Nikaitchuq LACT Station Commissioning |
An operator asked the Letton Hall Group to commission their LACT station, which ... |
|
Nikaitchuq LACT Station Modification |
Following the commissioning, The Letton Hall Group was asked to make recommendations... |
|
Oooguruk Measurement Technical Review |
The Letton Hall Group was asked to devise a measurement technical review program... |
|
Perdido |
The Letton Hall Group was asked to recommend how the production from this collection of ... |
|
Pompano Wet-Gas Measurement |
Two additional wells were to be drilled and tied back to the Pompano platform, one or ... |
|
Production Allocation Using Wet Gas/Multiphase Metering |
An operator had a requirement to define and implement an approved method of allocation... |
|
Production Allocation Using Wet Gas/Multiphase Metering (Pluspetrol Peru) |
An operator asked The Letton Hall Group to investigate allegations made by a pipeline... |
|
Red Eye Development Oversight |
Measurement experts in one operator were interested to see if the Weatherford ... |
|
Shenzi Measurement Analysis |
Bringing this large new field online required a well-reasoned measurement plan, which the... |
|
South Texas Gas Analysis |
The Letton Hall Group analyzed the production from a collection of wells representative of... |
|
USM Recalibration Frequency |
The Letton Hall Group was asked to study the stability of gas ultrasonic flowmeters and ... |
|
Wamsutter |
Wamsutter is a gas field in southern Wyoming near the borders with Colorado and Utah, which is .... |
