Canyon Express
- Description
- Contact and Links
When this project went online in the Gulf of Mexico in September 2002, production from each of the nine wells was connected to one of two 12-inch pipelines carrying the commingled wet gas back to the Canyon Station platform for processing, a distance of 91 kilometers away. Although for Canyon Express the gas is by far the more important component, in this early testing, the wet gas meters' estimates of liquid drew most attention. Whereas an absolute maximum of 100 - 200 BBL/D of liquids (production plus injected methanol) was expected through each meter, the initial estimates being returned by the meters were far greater, in some cases as much as 2000 BBL/D. The Letton-Hall Group was contracted to discover the reason for this discrepancy. We solved the problem and then assisted with production allocation until the fields were sold in 2006.
Contact Information
Name:
James Hall
Contact:
Mobile: +1-832-725-6776
hall@lettonhall.com
Name:
W. Letton
Contact:
Mobile: +1-713-825-0946
letton@lettonhall.com
